Skip to main content
Built for screens that never clock off.Read the field guide
Case studies

What it looks like in practice

Representative deployments showing the shape of the problem and how the setup solved it.

Retail · 12 stores

Promotions that follow the trading day

Before

Window posters were printed weekly and were out of date within two days. Nobody updated the in-store screens because it meant a USB stick per site.

After

One project per region, scheduled by daypart. A price change now reaches every window in seconds.

12

Sites on one dashboard

0

Site visits per change
Hospitality · 3 venues

Menu boards that switch themselves

Before

Breakfast boards stayed up until someone remembered to swap them, often mid-afternoon.

After

Three dayparts scheduled once. The boards change at eleven and five without anybody touching them.

3

Dayparts per screen

≤15s

Typical content check-in
Manufacturing · 1 plant

Line status on the factory floor

Before

Shift output was written on a whiteboard and the safety counter was often days stale.

After

A four-zone layout with live output beside a days-since-incident counter and a rolling safety reel.

4

Zones per display

24/7

Unattended running

These are illustrative scenarios, not named customer references.

Ready when you are

Something similar in mind?

Tell us the setup and we will say whether it fits.